CIG Construction / Project 03
Balcony deck renewal, Bristol
Failed balcony decks re-waterproofed, re-paved and re-guarded above occupied flats, with residents in place throughout.
- Location
- Bristol
- Sector
- Residential (social housing)
- CIG role
- Main contractor
- Programme
- May 2025, 2 months
The project
Balcony deck renewal,
Bristol
CIG Construction renewed the balconies and walkways of an occupied residential block in Bristol for a housing provider. Failed decking was stripped out and the decks re-waterproofed to the manufacturer’s specification, then paved on pedestals.
Balustrades were removed, treated and powder coated before refitting, parapet upstands rebuilt, and the lightning protection reinstated and certified. Residents’ belongings were cleared and returned around each balcony.

In the detail
Working above occupied homes.
Every balcony sits outside someone’s front door, so the work was sequenced bay by bay behind segregated scaffold, with residents kept informed and access maintained throughout.
Enlarge this detailThe project, in pictures
Other perspectives.
The finished work and the detail behind it. Select a photograph to explore.




CIG scope
The package
behind the pictures.
- Scaffold access around an occupied residential block
- Strip-out of failed decking and waterproofing
- New warm-roof waterproofing and paving on pedestals
- Balustrade refurbishment and powder coating
- Parapet upstands and lightning protection reinstated
Planning something similar?
Bring us the brief.
Share your drawings, location and target programme with the Construction team.
Discuss a similar package